Report 2008 Tige RZ2 EVA Flooring Install in Flooring Upgrade Projects Posted April 15, 2022 Total project was very time consuming. Probably 30+ hours. Templating took about 2 hours. Install was quick, but cutting the pieces took a while, getting the edges rounded out with the dremel sander requires some steady hands. Here are the trim strips. https://www.amazon.com/CHURERSHINING-Adhesives-Flooring-Material-(7-87ft)/dp/B07PM66SND
2008 Tige RZ2 EVA Flooring Install
-
-
-
-
-
in Flooring Upgrade Projects
Posted
Total project was very time consuming. Probably 30+ hours. Templating took about 2 hours. Install was quick, but cutting the pieces took a while, getting the edges rounded out with the dremel sander requires some steady hands.
Here are the trim strips.
https://www.amazon.com/CHURERSHINING-Adhesives-Flooring-Material-(7-87ft)/dp/B07PM66SND