Jump to content
  • projects-database-banner3.png

  • Share your completed boat projects!  DIY or Professional Installs

    Imagine a single giant database of boat projects for all brands, organized by category, boat type or budget.   Share your projects, find inspiration for a new upgrade, or learn the basics or low budget solutions from projects before you.   We can all share and learn from each other in one place.  

    No project is too plain, cheap or lame to post... all will be helpful to someone.  Let's build this!!!!

    Please register or log in first:

    1) Pick a category

    2) Click "Add New Project"

    3) Update your project anytime!

    ***Professional Shops are also welcome to showcase custom work for any category, but you must designate your company name under "installation shop"  with included info.

  • Sign in to follow this  

    Heater install


    Jeffo
    • Year: 2015 Brand: MB Sports Model / Trim: B52-23 Cost: $500-$999 DIY or Professional Install: I installed it

    We surf year round and this past winter, my 11 year old grand daughter starting going out with us on cold days. 

    We were on my buddy's boat in December and he had a heater.... when Taya wasn't surfing, she was bundled up and had that tube inserted in the bundle.

    me being the fat F that I am had always relied on the walrus effect for heat.

    well, I broke down and ordered a 3 port 42,000btu unit from heatcraft up in Idaho.

    when the unit came, I laid everything out and saw that I hadn't ordered a circ pump.

    theirs was pretty pricey so I got one on Amazon for $70.

    it met the specs of heatcrafts but was built for solar hot water. It works fine on 12 volts.

    i mounted the unit by drilling and bolting it to the rear seat framing just above the vdrive. I ran a tube and vent to cockpit area.

    i also ran a tube to stud and port sides. I didn't want to drill the seat bases and take up storage and speaker room. So I ordered ABS sheet- 3/16 thick and drilled 2 tube ports. I made one for each side and put them in place of the trays ( that seem to collect garbage) between the cup holders. I put a y on each duct and made new tube holders out of 3" abs pipe.

    so I have 4- 6' tubes. 2 per side plus the driver vent. 

    I ran the hoses to the marked fittings on the engine.next, I ran the wire to the existing heater switch. I tied the pump power into the fan power.

    I believe that this project was worthwhile for what we do and was well worth the money.

    jeffoIMG_1290.thumb.JPG.d778dc137eebb97736b7c5b6ae1f2f1b.JPGIMG_1291.thumb.JPG.d909144dfd4fbce476518a1d7f6d57b1.JPGIMG_1292.thumb.JPG.51e7f4acdbcef1b0fe8a0da9777995ac.JPGIMG_1293.JPG.2dd032ea1ca7dc11e9a65ed9f796ca40.JPGIMG_1294.thumb.JPG.844b9b6d68ddbfe28b7f0ccf59444659.JPG

    Sign in to follow this  


    User Feedback

    Recommended Comments



    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.

    Guest
    Add a comment...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...